停車棚在建設(shè)以及施工時要注意的事項

來源:http://www.baidala.cn/ 日期:2023-04-03 發(fā)布人:
隨著社會經(jīng)濟的迅速發(fā)展,膜結(jié)構(gòu)的停車棚的使用也越來越多,透光性是現(xiàn)代膜結(jié)構(gòu)停車棚被廣泛認可的特性之一。膜材的透光性可以為建筑提供所需的照度,這對于建筑十分重要。現(xiàn)在我們就來了解下濟南停車棚在建設(shè)以及施工時要注意的事項。
With the rapid development of social economy, the use of membrane structure parking sheds is also increasing. Light transmittance is one of the widely recognized characteristics of modern membrane structure parking sheds. The light transmittance of membrane materials can provide the required illumination for buildings, which is very important for building energy conservation. Now let's learn about the construction and precautions for parking sheds in Jinan.
A、加工準備及下料:依據(jù)施工圖放樣,放樣和號料時要預(yù)留焊接收縮量和加工余量,依據(jù)放樣作樣板。
A. Processing preparation and blanking: Set out according to the construction drawing, reserve welding shrinkage and machining allowance during setting out and marking, and use the setting out as a template.
B、預(yù)埋件安裝處理:定位預(yù)埋件安裝位置,打鉆安裝。要求預(yù)埋件位置準確、埋設(shè)牢固。標高偏差不大于9mm,左右位移不大于20mm。
B. Installation treatment of embedded parts: locate the installation position of embedded parts, and drill for installation. The embedded parts shall be accurately positioned and firmly embedded. The elevation deviation shall not be greater than 9mm, and the left and right displacement shall not be greater than 20mm.
C、測量放線:依據(jù)土建標高基準線測預(yù)埋件標高線,檢查預(yù)埋件標高偏差、左右偏差。整理結(jié)果,確定預(yù)埋件分隔的調(diào)整處理方案。
C. Surveying and setting out: measure the elevation center line of embedded parts according to the civil engineering elevation reference line, and check the elevation deviation and left and right deviation of embedded parts. Organize the results and determine the adjustment and treatment plan for the separation of embedded parts.
D、懸掛臂安裝焊接:懸掛臂安裝采用焊接,需檢查焊接節(jié),調(diào)節(jié)懸掛臂設(shè)計坡度,準確無誤方能進行焊接??窟呉粭l懸掛臂準確無誤后,安裝另一邊一條懸掛臂,就位準確后點焊。
D. Suspension arm installation and welding: The suspension arm installation adopts welding, and it is necessary to check the welding joints, adjust the design slope of the suspension arm, and conduct welding only if it is accurate and correct. After the suspension arm on the side is accurate, install the other suspension arm, and conduct spot welding after it is correctly positioned.
濟南停車棚
停車棚在施工時的步驟:
Steps for construction of parking sheds:
一,加工準備及下料:依據(jù)施工圖放樣,放樣和號料時要預(yù)留焊接收縮量和加工余量,依據(jù)放樣作樣板。
1、 Processing preparation and blanking: Set out according to the construction drawing, reserve welding shrinkage and machining allowance during setting out and blanking, and use the setting out as a template.
二,預(yù)埋件安裝處理:定位預(yù)埋件安裝位置,打鉆安裝。要求預(yù)埋件位置準確、埋設(shè)牢固。標高偏差不大于9mm,左右位移不大于20mm。
2、 Installation and processing of embedded parts: locate the installation position of the embedded parts and drill for installation. The embedded parts shall be accurately positioned and firmly embedded. The elevation deviation shall not be greater than 9mm, and the left and right displacement shall not be greater than 20mm.
三,測量放線:依據(jù)土建標高基準線測預(yù)埋件標高線,檢查預(yù)埋件標高偏差、左右偏差。整理結(jié)果,確定預(yù)埋件分隔的調(diào)整處理方案。
3、 Surveying and setting out: measure the elevation center line of embedded parts according to the civil engineering elevation reference line, and check the elevation deviation and left and right deviation of embedded parts. Organize the results and determine the adjustment and treatment plan for the separation of embedded parts.
四,懸掛臂安裝焊接:懸掛臂安裝采用焊接,需檢查焊接節(jié),調(diào)節(jié)懸掛臂設(shè)計坡度,準確無誤方能進行焊接??窟呉粭l懸掛臂準確無誤后,安裝另一邊一條懸掛臂,就位準確后點焊。
4、 Suspension arm installation and welding: Suspension arm installation adopts welding. It is necessary to inspect the welding joints, adjust the design slope of the suspension arm, and conduct welding only if it is accurate and correct. After the suspension arm on the side is accurate, install the other suspension arm, and conduct spot welding after it is correctly positioned.
通過以上小編的詳細介紹,我們對以上的信息有所了解,希望以上有您需要的信息,需要幫助的可以及時聯(lián)系我們。更多事項就來咨詢我們http://www.baidala.cn吧!
Through the detailed introduction by the above editor, we have gained some understanding of the above information. We hope that you have the information you need above. If you need help, please feel free to contact us in a timely manner. For more information, please consult us http://www.baidala.cn Come on!

閱讀/ Recommended reading

  當濟南的烈日與風雨讓推拉蓬的遮陽布變得破舊褪色,及時更換不僅能恢復(fù)遮陽擋雨功能,還能讓戶外空間煥然一新??此茝?fù)雜的更換過程,掌握正確步驟后也能輕松完成。從準備工具到安裝收尾,這...

濟南遮陽蓬接縫 “防水保衛(wèi)戰(zhàn)”:細節(jié)之處見真章 2025-06-25
濟南雨棚:不止于遮雨的 “全能空間助手” 2025-06-20
濟南遮陽棚安裝工具詳解:從基礎(chǔ)到的全流程裝備指南 2025-06-05
濟南可移動式推拉棚可以幫助生活中有什么優(yōu)勢? 2025-06-03

魯公網(wǎng)安備 37010302000864號